
The Queensland government is investing $60m in a new coal shiploader at the Port of Gladstone, which will replace a more than 40 year old piece of equipment.
“The new shiploader will secure the capacity of the RG Tanna terminal for another 25 years, ensuring this vital export port can continue to meet the needs of its customers. As the Port of Gladstone grows and diversifies to export the hydrogen electrolysers that Fortescue Future Industries will manufacture here, we know coal export[s] will also be part of its future for decades to come. The 36 per cent rise in the value of Queensland coal exports from 2020 to 2021 played a significant role in the overall value of our exports, which rose to nearly $80 billion for the year,” Queensland Treasurer and Minister for Trade and investment, Cameron Dick, said.
The new ship loader will be built within Gladstone Ports Corporation’s Port Central Precinct, then transferred via a heavy ship lift to the site of operation.
Design will start in March 2022 and commissioning is planned for May 2024.
GPC Chair Dr Anthony Lynham said the shiploader build was a first for Gladstone and one of the most significant projects the port had undertaken.
“This is a once-in-a-career opportunity for our team due to the sheer lifespan of these assets, and to see the shiploader being fabricated right here at the port is a great achievement, not just for the port but for the community and for the state – keeping jobs local,” Dr Lynham said.
“Traditionally, machines of this size are constructed overseas and imported into Australia, so to be able to build one right here at Auckland Point is a significant achievement and a boost for manufacturing in Queensland.
“Once complete, the shiploader will be loaded onto a heavy lift ship and taken to our export terminal.
“It’s wonderful we have the infrastructure and resources to complete this significant project right here in Gladstone,” Dr Lynham said.